Installing Custom Kitchen Cabinets

Installing new cabinets in your kitchen to a great extentthem together by placing them on a horizontal surface.
can enhance the look and usefulness of your kitchen.Always be conscious about the height difference and
At the present time, customers and clients have beenproportion of the cabinets because it may create gaps
giving their homes extra attention since they knowor rigidness between them.
much more about houses and their interiors now inMake a sub-assembly. Attach each single cabinet
comparison to earlier times. The clients and customertogether by placing them backside up on a flat
visit the furniture showrooms equipped with somesurface.
specific things that they want for their custom kitchenStep 7
cabinets. Even if your kitchen design needs help fromOnce you have fixed the cabinets to a flat surface
an expert, installing cabinets can be done by yourselfand attached it permanently with help of screw and
and at the same time will help you to save a lot ofscrewdriver, then you have to secure the overhead
money. The next step is the installation of kitchencabinets. At the back of cabinet you can find the
cabinet. You must always install hanging cabinetshanging strip where you have to pierce the nails.
before installing the base cabinets. It is much easier toBeside the stud you also have to relocate the hanging
work on hanging cabinets with no base cabinets in thestrips within the cabinet. With the help of a drill you
way. Installation of kitchen cabinets can be easier thanmust drill pilot holes and then fix the screws. With
you would think. The cabinets can be installed byeverything attached you can then attach the cabinetry
yourself or you can hire a professional contractor toto the wall.
do the installation job for you. Installation for both wallInstallation of custom kitchen cabinets is relatively
and base cabinets can be easily done if you arestraightforward and follows basic steps such as:
familiar with the instructions for their installation. SomeStep 1
very simple steps must be followed to make yourFor installing base cabinets you must locate the highest
installation an easy task.point on the floor. The back of the base cabinets must
Installation of wall base cabinetsbe at the same height and level with the front. If the
Step 1highest point of the floor is near the wall then the front
Before placing any order for your kitchen cabinets, youof the cabinets must be elevated with the help of
must very carefully examine the requirements for yourshims. If the highest point on the floor is away from the
cabinets such as what should be the size, shape, color,wall then the back of the cabinets must be elevated to
design etc. of the kitchen cabinets. This step is verythe same height.
important because of the simple fact that a kitchenStep 2
cabinet without a required proportionate size or shapeYou must draw a straight line on the wall to mark the
is of no use.top of the base cabinets. This will help you to identify
Step 2the exact height of all the base cabinets so that the
Determining the right position for the kitchen cabinets iscountertop of all the cabinets is at the same level.
a very important aspect of installation. It is an utmostStep 3
requirement that you mark an exact level position withCabinets are preset collectively before fasteners are
help of pencil. It will help a lot and make your installationinstalled. The installers fasten the cabinets before
easier when you know in advance the level andattaching them to the wall
position where kitchen cabinets are to be installed. TheStep 4
level and position of the cabinet should be such thatShims and levels are used for positioning as well as
you can easily reach into them without any stress.leveling the cabinets. Before putting the cabinet in place
Step 3you must check and ensure that the cabinets are
Installation of wall cabinets must be given the highestaligned without any mistakes or errors. They must be
priority when installing kitchen cabinets, because of theperfectly aligned with the line scribed on the wall
simple fact that they will provide you good deal ofpreviously. You can use shims for raising the base
space and also they do not occupy alot of space. Youcabinets. Shims are placed over the studs whenever it
can use the other empty floor space for installation ofis necessary to adjust the cabinet.
lower level kitchen cabinets.Step 5
Step 4Once the level of the cabinets is perfectly correct,
Search for the studs in the wall. Mark the position ofthen you can fasten the cabinets to the wall. The
wall studs once you have located them. With help of afastener must be screwed through the cabinet before
pencil you must mark the position an inch above and 6inserting it into wall studs. Three-inch screws are used
inches below where the installed custom kitchento fasten custom kitchen cabinets to the wall.
cabinets bottom would be. The stud finder can helpStep 6
you in locating each stud.The last step is to install the entire remaining fixtures
Step 5like doors, drawers, partition, shelves and hardware.
For the wall cabinets the first thing you must do is toPivots or the hinges can be concealed or covered
attach a temporary supporting bar the size of thedepending on the style of cabinets.
cabinet's length. Attach rail's upper frame parallel toAll these above steps are simple and can be easily
cabinet's bottom edge and then attach a support toused to install any type of cabinetry. Note that you
the wall with the help of screws.must never screw cabinets together all the way
Step 6through thin walls. Always screw the framing or ledger
Prepare several single cabinets and then combineboards first.